Grindmaster-Cecilware NHT2ULBL Double Granita Machine (2) 2.5 Gal Dispensers Black
In Stock - Pickup Available
Grindmaster-Cecilware Model: NHT2ULBL SKU: 172143
Out Of Stock
Item discontinued!
Similar Models Available: |
---|
![]() New I-PRO 2E |
![]() New I-PRO 2E |
Recommended Substitute
Fast Shipping
![Grindmaster-Cecilware I-PRO 2E Countertop Granita Machine w/ (2) 2.9 Gallon Bowls Grindmaster-Cecilware I-PRO 2E Countertop Granita Machine w/ (2) 2.9 Gallon Bowls](https://pics.acitydiscount.com/pics/dp/peachtrader/dp_n206074.jpg)
I-PRO 2E Countertop Granita Machine w/ (2) 2.9 Gallon Bowls
GMCW
I-PRO 2E
SKU# 206074
$2,970.00
Login or get price by email
Grindmaster-Cecilware NHT2ULBL Specifications
Low Price Guarantee On All Grindmaster-Cecilware Products!
The FRIGOGRANITA® Granita Dispenser features (2) 2.5 gallon capacity clear bowls, simple manual fill system, suction cup compression seal system, and a programmable defrost timer.
Features
- Granita dispenser
- Double 2-1/2 gallon capacity
- Clear bowls with graphic top
- Manual fill
- Black painted exterior
- Suction cup compression seal system
- Programmable defrost timer
- 115v/60/1-ph, 1/2 hp, 15 amps with cords
- ETL, NSF
Warranty
This item comes with a (2) year parts & labor warranty.
![GMCW](https://pics.acitydiscount.com/logos/48.png)
Manufacturer Information | |
Brand | Grindmaster-Cecilware |
---|---|
Model | NHT2ULBL |
Model | NHT2UL |
Model | NHT |
Power Information | |
Power | 115 volts |
Phases | 1 |
Item Dimensions | |
Weight | 95.00 lbs. |
Width | 14.25 in. |
Depth | 18.50 in. |
Height | 27.75 in. |
Documents
![NSF Listed](/images/categories/buyers_guide/certification_marks/NSF.gif)
NSF Listed
This product meets National Sanitation Foundation (NSF) standards for public safety & environmental factors with regards to design, manufacture, operation, and labeling.
![ETL Listed](/images/categories/buyers_guide/certification_marks/etl.gif)
ETL Listed
This product is ETL listed and has been been found to meet minimum requirements for product safety, is produced in a facility that meets compliance measures, and is subject to period inspection.